boiler
boi-3
Retubing of high pressure water tube boilers has always remained our main area of specialisation. Repairs to "SUNROD" elements alongwith outer smoke tube, complete retubing of ALLBORG's AQ5 and AQ9 type boiler, large scale retubing of generating as well as front rear & side water wall of monowall designs on various BABCOCK & WILCOCK makes have been successfully tackled by our Riding Team Repair Squad.
Entire work is carried out under a close inspection of the class surveyors. The complete system is subjected to hydraulic test pressure upto 1.5 times normal working pressure.
Manufacturing of complete
Exhaust Gas Economisers
bio5x bio1x
bio7x
1. Fitment of tubes in progress after carring out dye penitrant test on steam drum of SUNROD boiler.
2. Tubes being aligned & welded to bottom header by TIG welding process.
3. Fin welding of membrane wall in progress.
07 09
boiler1 boiler2 boiler4
Secondary tube nest for 45 tons/hr capacity water tube boiler of Babcock & Wilcock design being fabricated at our works in Mumbai.
Build up corrugated furnace being manufactured at our base in Mumbai for 15 tons/hr. Cap. vertical smoke tube boiler.
blrplat
tubeexp
Tube Plate hole drilling in progress. Our expert boiler maker at work.