new
Renewal of damaged Crane jib arm Section.
Total length renewed :10 mtrs.
Downtime for repairs :72 hrs.




25x 29x
Appling finishing touches prior to the final load test
8x
Scaffolding erected to reach the damaged area
31x
ani3x 21x
3x
Internal strengthning provided before fitment of prefab jib arm section

HYDRAULIC RAM OVERHAULING


Staging irrected prior commencement of work.

Hydraulic Ram being disconnected from the jib arm by removing the locating pin.

Ram being removed from the cylinder body for overhauling.
CRANE JIB REPAIRS
cp1 cp2 cp10
1. Sets of ruptured & torn arms.
2. Glimpses of cut out portions of damaged arms.
3. More than 50% of the arm sections had to be renewed due to severity of the damage caused by parting of topping wire.
cp7 cp6 cp12
4. Sections being realigned on skid.
5. Progressive fitment of sections.
6.
Old undamaged sections of the jib arms being aligned with new replacement section after edge preparation of joining edges.
cp4 cp5 cp8 cp11
7. Aligned new & old sections being strengthened by bracing.
8. Centerline alignment fitment of all sections (new & old) on the skid prior to welding.
9. Our welders at work.
10. Arm sections being aligned on the skid.
cp9 cargo1
11. Damaged crane platform being cropped and renewed.
12. Rigging of topping & runner wire in position prior to load test.