pipeline
pipeline
8500 meters of deck hydraulic line renewed between passage Houston to Antwerp by our 6 member Riding Team, for one of the Norwegian Owner. Pipes specially drawn and flown from Mumbai to Houston to meet urgency of the situation.
MANUFACTURING & INSTALLATION OF HEATING COILS ON TANKERS.

Handysize product carriers more than 20 years of age pose serious problems while fixing up these vessels with oil Majors. Some of these vessels which have been maintained in very high standards of shipboard maintenance with the condition of tank coatings in excellent condition have been rejected on account of their age factor.

However some of the sensible owners, realising the active age still available with these vessels, have converted them from petroleum to veg oil or molasses trades by retrofitting these vessels with TANK HEATING COILS.

With comparatively smaller additional investment between 160 - 300,000 U.S. dollars the entire investment could be recovered in just one year period and that too with higher charter rate than the conventional petroleum product earnings.

The investment choice of 160 - 300,000 USD is left with the owners with the option of using either carbon steel or S. S. hardware for retrofit purpose. Owners who intend to trade their vessels for just 3 - 5 years go in for smaller investment and for those who want their vessels to trade between 5 - 8 years do not mind spending more for troublefree longer span.

If the vessel's plans are sent couple of months in advance the material can suitably be identified and most of the retrofit in prefab condition can be kept ready at our base. The choice thereafter is left with the Owners either to lay up the vessel for 10 -15 days to carry out the entire retrofit and commissioning thereafter or to carry out such retrofit by utilizing our Riding Teams on a long sea passage.

4T
Heating coil steam being tapped off from main steam supply to vessel's windlass.
Individual tappings being branched off from main steam supply line on deck.
5T
7T
Provision of expansion loop in the main steam supply line.
  A typical supply and return line manifold.