Outer Seal of an Aframax size tanker being replaced by our team after
raising stern tube out of water and then providing work safe staging
prior to shifting entire tailshaft / propeller assembly by 850 mm
aft prior carrying out satisfactory repairs. We also provide back
up electric power, compressed air supply and stand by fire tender
during such operations.
Time required - 3 days, from start to finish.. |
| Aft
seal of an Aframax size tanker being renewed in afloat conditions.
We create a virtual Floating Dock for such jobs ! |
|
|